Application

Dew point is more than the 3 °C rule: how to qualify a coating window

A dew-point check usually collapses into one line: humidity is under 85%, so we can spray. The reading that actually decides the outcome is the margin between steel temperature and dew point. Humidity is only an input; the dew point is the result, and air temperature sits between them. At 80% RH and 30 °C the dew point is about 26 °C; at 15 °C it is about 11.6 °C. If night-time radiation pulls the steel down to 12 °C, the first case still has 4 °C of margin and the second has 0.4 °C.

Readings have a fixed order: air temperature and relative humidity, derive the dew point; steel temperature at several points across the area, using the lowest; subtract; compare with the 3 °C floor; then look at the temperature trend for the next few hours. ISO 8502-4:2017 rules out non-contact instruments for surface temperature, because emissivity differs between blasted, rusted and painted surfaces and an infrared gun can read three or four degrees off.

The standard sets the method and the 3 °C floor; the product data sheet sets the conditions. PSPC-approved ballast-tank grades typically state 3 °C above dew point and RH not above 85%, while standard epoxies need about 5 °C minimum application temperature and low-temperature grades go to -5 °C or lower. Keep air temperature, RH, steel temperature per point, dew point and coat start and finish times on one sheet — along with the agreed window in the technical agreement for export projects, where site conditions after FOB are outside the supplier's control.

Need selection advice?

Tell us your substrate and service conditions

One-to-one coating consultancy: system design, quantity take-off and quotation.

Contact us
WhatsApp