INSIGHTS

Insights

Practical coatings content written for specifiers and applicators.

Market

Three 100,000 m³ crude tanks: 55,200 m² of coating, and who buys the paint

For the same square metre of tank protection, the buyer of the paint may be a completely different party. Domestic overhauls put coating materials under contractor supply, so the buyer is the applicator's procurement team. Overseas EPC splits painting out as a separate package, so the buyer becomes the subcontractor. New-build coatings often sit inside an EPC framework agreement. Knowing which layer you are in tells you who to call.

Read more →
Technical

Can a specified coating grade be substituted? Pass three checks first

Technical specifications often carry the phrase "brand X or equivalent". Those three words open a door to substituting a grade, but they are not permission — they shift the burden of proof onto whoever wants to change. Most substitutions fail not because the product is inadequate but because the evidence was never assembled.

Read more →
Selection

Epoxy vs inorganic zinc-rich primer: how to choose

"Zinc-rich primer" is four words on a requisition, and both epoxy zinc-rich and inorganic zinc silicate answer to them. Yet the two differ completely in curing conditions, overcoating requirements and temperature rating, with prices thirty percent apart. Choosing wrong rarely costs you in paint; it costs you in programme and rework.

Read more →
Market

Why tank corrosion work is rarely tendered separately

Tank corrosion protection is almost never tendered as a paint purchase on its own. The coating travels inside the application contract or sits in the main contractor's technical schedule. The reason is simple: the work content is in surface preparation and scaffolding, not in the material, and separating out the paint breaks the chain of responsibility. Understanding that tells you where the coating business actually sits.

Read more →
Technical

Can one coating system serve steel, tank farm and piping?

A common idea on an industrial site is that steel is steel, so one system across the whole plant is the simplest route: one bill of materials, one batch, one mobilisation. It does save procurement and briefing effort. But at least three categories of asset on that site fail differently and cost differently to repair. Blanketing them with one system spreads the risk of the most expensive ones across everything.

Read more →
Application

Epoxy floor peeling: check these three substrate factors first

When an epoxy floor lifts, the first instinct is to blame the paint. Open it up and the failures cluster at edges, doorways, around equipment plinths and beside joints. What those places share is not the coating but the moisture content, strength and levelling of the substrate. The paint is simply the layer that gets pulled off last.

Read more →
Technical

Can zinc-rich primer go over a St3 surface?

"Blasting cannot reach this area. Can we go St3 and put zinc-rich straight on?" It is the most common question in repair yards. The answer is yes, provided everyone understands where St3 falls short, or five years later you will open up rust rather than a film.

Read more →
Selection

Topcoat for outdoor steel: polyurethane or epoxy?

Epoxy topcoat is inexpensive, bonds well and resists chemicals, but it has one weakness that cannot be formulated away: it is not UV stable. Outdoors it chalks and loses gloss within months and looks dull within a year. Polyurethane topcoat, cured with an aliphatic isocyanate, holds gloss and colour for five to eight years. Behind those numbers is chemistry, not formulation skill.

Read more →
Product

PPG phases out SIGMACOVER 380, replaced by a new grade

PPG has issued a product change notice for SIGMACOVER 380, the general-purpose pure epoxy primer: the grade is being phased out and replaced by SIGMAPRIME 700 HSV. For projects currently using it, this is not simply a change of name — the scheme, overcoating intervals and certification scope all need re-checking against the new product.

Read more →
Technical

Ballast tank coatings keep failing? The key PSPC points are these

The PSPC text looks highly specific: surface preparation, profile, salt level, 320 micron DFT, light colour, inspector qualification, coating technical file. Many projects therefore treat it as a checklist and consider compliance achieved once every box is ticked. The real problem is that a coating which passes the boxes does not necessarily last 15 years.

Read more →
Technical

DFT and solids: why theoretical quantity rarely matches reality

Theory says twenty litres covers a hundred and sixty square metres; in practice you run dry at a hundred and twenty. The first reaction is a short fill, but with the formulation sheet open the shortfall usually comes from three places: the wrong solids figure, no loss factor, and roughness treated as zero.

Read more →
Application

Is it really Sa2.5? Four field checks before priming

"Does this count as Sa 2½?" is the most argued sentence in protective coating work. Each side holds up a phone photo and neither convinces the other. Judgement actually has a defined method resting on four things: the comparator, profile depth, soluble salts and surface dust. The first three have instruments, the fourth has a tape method, and all four leave a record.

Read more →
Application

Coating in cold and humid conditions: what to re-check

Coating failures cluster in winter and the wet season, and the cause is usually a narrower application window against an unchanged schedule. Three readings decide whether work proceeds: steel temperature, dew point and relative humidity.

Read more →
Selection

Is alkyd paint obsolete? It still has a place in maintenance

In technical discussion alkyd is treated as obsolete; everyone talks epoxy, polyurethane and fluoropolymer. Yet on real maintenance sites alkyd still moves large volumes. Not because it performs well, but because under certain conditions it is the best value: single pack, brushable, tolerant of old coatings and cheap.

Read more →
Technical

Glass flake coatings are not universal: when they pay off

The principle of glass flake coatings is easy to grasp: thin glass platelets lie parallel within the film, so any medium permeating it has to travel around platelet after platelet, extending the path many times over. That makes it genuinely strong in immersion and chemical service. The problem is that it is often specified where it is not needed, and badly applied where it is.

Read more →
Application

DFT measurement that counts: applying the 85-15 rule on site

The most common situation in dry film thickness inspection: the average is on target, the report says pass, yet a handful of individual readings sit at sixty percent of the specified value. Judged by average it passes; judged point by point it fails. The difference is not the instrument but which set of rules applies — and that has to be settled before work starts.

Read more →
Selection

Antifouling: the real difference between SPC and CDP

The commonest mistake in antifouling selection is treating "years" as the only criterion. Two products both rated for five years can save fuel on an ocean-going ship and fail within two years on an inland vessel. What decides it is not film thickness but the operating profile: speed, activity ratio, idle time and water temperature.

Read more →
Need selection advice?

Tell us your substrate and service conditions

One-to-one coating consultancy: system design, quantity take-off and quotation.

Contact us
WhatsApp